Project Description:
This project includes construction of a new 100’ tall central warehouse required for the overall New Haven Line to serve as the main distribution point for material for the storerooms contained within the individual shops, as well as for major components of the M-8 cars. The warehouse utilizes a high density automatic storage and retrieval system (ASRS) located directly adjacent to the Component Change Out Shop